Pipeline

Pipeline

Pipeline

 

← Back to Cymric Pipelines

Overview

Nuevo Energy installed approximately seven miles of new 8” soft water pipeline and four miles of new 12” produced water pipeline. Cannon provided design engineering services to facilitate the construction of the pipelines and connections to facilities at each end. Cannon provided stress analysis, designed pipe supports and road crossings for county roads and state highways, and prepared details for pipeline routing and corrosion protection for both pipelines. Cannon also provided facility design services for equipment and piping at each end of the new pipelines. Services included hydraulic analysis, pump sizing and selection, power supply, control system design and selection, foundation and interconnecting piping design.

Back to Service

Information

Location
Kern County, California

Market
Pipeline

MENU