Overview

This 64-acre development contains 297 single family residences, condominium townhomes, courtyard homes, and a 60,000-square foot neighborhood commercial center.  Cannon was selected by the development firm to provide engineering, planning, surveying and construction administration services for the Villages at Dove Creek in Atascadero, California.

Engineering services for this project included the preparation of a tentative map, a detailed drainage study and FEMA CLOMR analysis and approval, grading and drainage plans, sewer and water master plan studies, utility system design, opinions of probable costs, as well as construction documents.  The drainage study included specialized design of detention basins that matched flow patterns to the storm events, which were configured to be dual use as parks and designed to control outlfow.  Cannon also coordinated with regulatory agencies for permits and compliance.  This work included coordination with the Army Corps of Engineers for a Wetlands (404) permit and NPDES permitting through the Regional Water Quality Control Board.  Surveying services included the preparation of a tentative tract map, final map, topographic survey, condominium plans, agricultural ALTA survey, boundary survey and construction staking.

Back to Market

Information

Location
Atascadero, California

Market
Watershed Management

MENU