← Back to Long-Term Energy, Cogeneration, and Dehydration System Studies

Overview

Cannon was selected to assist with Aera Energy’s three-platform BETA production complex. Cannon prepared two studies: a long-term energy study and an efficiency study. The long-term energy study included a comparison of methods for providing supplemental energy to the offshore production complex. The efficiency study was conducted to evaluate options to improve the efficiency of BETA’s dehydration system. In addition to these studies, Cannon has worked on other BETA Complex projects: sub sea pipeline/leak detection system, investigation of sulfur lay-down in fuel gas, pipeline pigging systems, topside water treatment options, lube oil mist eliminators, and numerous other facility improvement projects. All projects included analysis and coordination of federal, state and local permitting activities.

Back to Market

Information

Location
BETA Offshore Production Complex, California

Market
Upstream
Utilities Power
Energy Power

MENU