Refining and Chemical Processing

Refining and Chemical Processing


← Back to Oil Refinery Boiler Replacement and Air Blower Modifications


Three boilers were upgraded at this Central Coast refinery to comply with air emission requirements. The three 33,000 lbs/hour boilers were replaced with a 100,000 lbs/hour boiler. As part of this project, various pieces of equipment were demolished or modified and the project site was re-graded. Two sewer lines were also relocated. Engineering items included preparation of plans and specifications for grading, drainage, storm water, and sewer systems; and a review of mechanical design for the project. Survey included preparation of a topographic survey.

Back to Service


San Luis Obispo County, California

Refining and Chemical Processing