← Back to Templeton Interceptor Line Lift Station No.2 and Sewer Reach 2 & 4


An existing lift station and the sewer main reaches were running at or near capacity and therefore were limiting the efficiency and ultimate build-out service of the Templeton Interceptor Line.

To solve this problem, the City of Paso Robles decided to upgrade Lift Station No. 2 and Reach 2 & 4 of the Templeton Interceptor Line to increase the flow capacities. Cannon provided the surveying and engineering design services for the project. The scope of work included fundamental project research and data collection as well as project meetings and coordination efforts; preparation of engineering plans, specifications, and cost estimates for the construction of lift station upgrades and approximately 10,000 lineal feet of new sewer mains; and construction administration services. The construction administration services including bid support, a pre-construction meeting, construction engineering, site visits and inspections, and as-built drawing preparation and submittal. In addition, Cannon prepared a topographic survey; aerial topographic surveying; and supplemental design surveying as needed, to define the existing surface features and as-built conditions for the lift station and Reach 2.

Back to Service


Paso Robles, California