← Back to Water Reuse Creek Gauge


Cannon Instrumentation and Controls staff assisted the City of San Luis Obispo with the Water Reuse Creek Gauge project. The project involved installing and testing a system to monitor the water level in the San Luis Creek to comply with environmental regulations. The system includes a solar powered industrial process controller that monitors the output signal of an industrial ultra-sonic distance measuring unit. The information obtained from the controller is transmitted over the Internet to a special computer network within the City’s WAN system. The information is presented on a touch screen for the Water Reuse Facility plant operators. The level information is data logged to an FTP server and available to City staff from anywhere on the City’s network.

Back to Service


San Luis Obispo, California