Santa Monica-Malibu Unified School District selected the Cannon-Parsons team for the water system improvements project at Busch and Merritt drives to provide adequate fire flow and pressure to Malibu High School and Middle School. Cannon provided surveying and civil engineering design for additional water mains, a pressure regulating station, and necessary interconnections. Services included topographic survey and utility research; design for approximately 2,200 linear feet of 12-inch steel and ductile iron pipe, as well as design for a pressure regulating station located at the Lower Busch Tank site that reduced the pressure from 860 PZ to 325 PZ.