Residential Development

 

← Back to Anavia Apartments

Overview

Cannon provided civil engineering design and survey services for this 255-unit, five-story residential and two-level underground parking condominium project in Anaheim’s Platinum Triangle, located on the west side of State College Boulevard and north of Orangewood. This project was converted into apartments in 2009 as the City of Anaheim began their redevelopment for the area around Anaheim Stadium.

The Platinum Triangle now features new residential, commercial and retail complexes, bringing new life to the district. The entitlement of the project included preparing a tentative parcel map, a parcel map, and condominium plans for the 255 units.

Cannon prepared civil engineering design, including the preparation of plans, specifications, and estimates for the rough and precise grading, off-site and on-site storm drain, and sewer line study. A major design challenge involved construction of 800-linear-feet of 8-inch VCP sewer main along State College and Artisan Court, to comply with the City of Anaheim’s master plan of sewers. Other services included the traffic signal at State College and Artisan Court, Water Quality Management Plan (WQMP), sewer and water reports to confirm adequacy of the sewer and water facility, as well as construction staking and construction engineering support.                    

Back to Market

Information

Location
Anaheim, California

Market
Residential Development
Water Supply

Service
Engineering and Design

MENU