Cannon provided construction management and inspection services to the City of Guadalupe for the rehabilitation of more than three miles of local roads and major regional transportation corridors throughout the city. The scope of work included cold planning of existing asphalt, removal and disposal of lead contaminated thermoplastic, installation of Asphalt Protection Fabric, HMA overlays, Type II slurry seals, and extensive re-striping and pavement marking. The manholes and utility valve covers were raised to match the new asphalt surfaces and painted stripes, and thermoplastic pavement markings were applied.

Additional work to repair or replace damaged sidewalks, curbs, and gutters was also completed. Cannon removed and replaced raised and broken concrete sidewalk on Guadalupe Street (SR 1) and installed more than 1,050 feet of large diameter RCP storm drainage, catch basins, and utility relocations. Cannon provided drainage improvements, such as cross gutter revisions, driveway widening and reconstruction, and new drainage inlets to eliminate stormwater surcharges and ponding.

Special construction requirements were incorporated since the project was located within a busy commercial business area and agricultural commerce thoroughfare. In addition to close coordination with the contractor and full documentation of construction activities and legal compliance, Cannon developed and conducted a comprehensive public relations program for the purpose of informing residents and businesses of upcoming construction activities. Cannon also worked with the contractor and residents to maintain continual access and use of the roads during construction.

Back to Service

Information

Location
Guadalupe, California

Service
Construction Management

MENU