
Overview
Cannon provided survey services to the Morro Bay Power Plant to help facilitate the replacement of their generator (circa 1952). As part of this effort, Cannon was tasked with aligning the shaft for placement of the new generator. Cannon provided the control to tie into the Plant Grid as well as construction layout.
Back to Service