
Overview
After several decades of use, five culverts (circa 1940) and a wooden bridge within the Main Garrison of Camp Roberts required replacement. Cannon prepared plans and specifications for the replacement or rehabilitation of five storm culvert and bridge sites within the Main Garrison. The scope of work included the preparation of a hydrology and hydraulic analysis; plans, specifications and cost estimates for grading, excavation, 100-year flow storm water culverts, and the replacement of a damaged wooden bridge with a modular concrete bridge. The drainage watershed for all culvert sites was analyzed resulting in spans up to 24 feet.
Back to ServiceInformation
Location
San Luis Obispo, California