Aerospace / Defense

Aerospace / Defense

Aerospace / Defense

$nbsp;

← Back to SLC FUT Enclosures

Overview

A private aerospace company maintains the launch facility at Space Launch Complex 6 at Vandenberg Air Force Base. The Fixed Utility Tower (FUT) provides support for equipment that braces rockets and payloads prior to launch. The client wanted to enclose portions of the FUT to shield equipment and engineers from the high winds and driven rain common to the site. Cannon included additional framing and siding details to provide the desired protection with the capability to resist the extreme loads associated with wind exposure and blast loads related to rocket launches.

Back to Market

Information

Location
Lompoc, California

Market
Aerospace / Defense

MENU