The City of Paso Robles selected Cannon to design wellhead facilities, a one-mile stretch of pipeline and distribution-system connections. The project included installation of a well new pump, electrical system, chlorination system, connection to the City’s SCADA system, and construction of new pipeline to connect the new well to the existing distribution system. Cannon provided pre-design alternatives analysis, utility coordination, preparation of plans and specifications for water systems, as well as construction management services. The piping and valve design included approximately 6,300 feet of ten inch ductile iron transmission main and associated appurtenances. Cannon additionally provided topographic, right-of-way and construction surveys.