Overview

To improve water quality and accessibility, the City of Tulare began improvements to the City’s water system including the construction of five new wells throughout the City. The City retained Cannon to provide design and engineering services for the equipping of Well 4-3, a 1,000-gallons-per-minute well. Cannon’s scope of services included civil, mechanical, structural, electrical, automation/controls engineering, survey, and landscape architecture.

Civil work services for the site included paving, drainage, fencing, along with well pump, motor, and electrical equipment selection. In addition, Cannon provided design and engineering services for the STP-1 Pipeline, a 14-inch pipeline (approximately 3,500-feet in length), including tunneling under the Southern Pacific Railroad to install of 150-feet of 30-inch casing pipe to house the waterline

Back to Service