Lynch Canyon Facility Expansion
A petroleum producer expanded production of their Lynch Canyon field 500%. This expansion required engineering and design services for a new tank battery and processing facility adjacent to the existing facility.
The new facility included a tank battery with tank vapor recovery equipment to handle increased oil, wastewater, and gas production; produced water handling equipment; new steam generator site and water filtration/softening equipment; expanded wastewater injection system; electrical, instrumentation and control infrastructure; H2S treatment equipment; and pipelines connecting the new facilities to existing field facilities.
Cannon provided civil, mechanical, structural, and electrical engineering; project surveying; project management; permitting assistance; construction administration; and start-up and commissioning support.
Location
San Ardo, California
Key Elements
- Industrial Wastewater
- Mechanical Engineering
- Electrical Engineering
- Survey and Mapping
- Automation
- Pipeline Design