Lynch Canyon Facility Expansion

A petroleum producer expanded production of their Lynch Canyon field 500%. This expansion required engineering and design services for a new tank battery and processing facility adjacent to the existing facility.

The new facility included a tank battery with tank vapor recovery equipment to handle increased oil, wastewater, and gas production; produced water handling equipment; new steam generator site and water filtration/softening equipment; expanded wastewater injection system; electrical, instrumentation and control infrastructure; H2S treatment equipment; and pipelines connecting the new facilities to existing field facilities.

Cannon provided civil, mechanical, structural, and electrical engineering; project surveying; project management; permitting assistance; construction administration; and start-up and commissioning support.

Location

San Ardo, California

Key Elements

  • Industrial Wastewater
  • Mechanical Engineering
  • Electrical Engineering
  • Survey and Mapping
  • Automation
  • Pipeline Design