Eagle Petroleum expanded production of their Lynch Canyon field 500% . This expansion required engineering and design services for a new tank battery and processing facility adjacent to the existing facility constructed in 2004.
The new facility included a new tank battery with tank vapor recovery equipment to handle increased oil, wastewater and gas production; produced water handling equipment; new steam generator site and water filtration/softening equipment; expanded wastewater injection system; electrical, instrumentation and control infrastructure; H2S treatment equipment; and pipelines connecting the new facilities to existing field facilities.
Cannon provided Civil Engineering, Mechanical Engineering, Structural Engineering, and Electrical Engineering, survey, project management, permitting assistance, construction administration, start-up and commissioning.