Vista Canyon Recycled Water Main Extension

Cannon was selected by the Santa Clarita Valley Water District (SCV Water) to provide construction management, inspection, and materials testing services for Phase 2B of the Vista Canyon Recycled Water Main Extension. This phase of the project and recycled water main extension is part of the SCV Water recycled water master plan for the Santa Clarita Valley. This section of the system, per SCV Water Master Plan, will receive tertiary recycled water from the Vista Canyon Water Factory. The project includes 10,870 linear feet of new 12-in, 8-in, and 6-in diameter ductile pipeline and 150 linear feet of 12-in diameter pipe under the existing Lost Canyon Bridge. Cannon provided consulting services for submittal reviews, RFI’s, billing review, on-site observation, review of as-built drawing, and final punch list assistance.

Location

Santa Clarita Valley, California

Key Elements

  • Submittal Reviews
  • RFI’s
  • Billing Review
  • On-Site Observation
  • Review of As-Built Drawings
  • Final Punch List Assistance
Click to View Full Size
Image
Image
Image