Well 45 Integration

The City of Tulare selected Cannon for engineering and design services for five water well equipping projects for the City. Well No. 45 is the first of these five wells and is currently in construction. The project included a selection of a new 1,000 GPM pump and motor and electrical equipment. The civil site work included a new utility building, drainage, paving, emergency power, security fences, lighting, and architectural landscaping. The new well remained connected to the existing water system.

To efficiently select the proper pump and motor, Cannon was responsible for directing and conducting reviews of the hydraulic modeling. The project included every engineering discipline provided by the Cannon team, including civil, structural, mechanical, electrical & instrumentation, automation, SCADA, and landscape architecture.

Location

Tulare, California

Key Elements

  • Civil Engineering
  • Structural Engineering
  • Mechanical Engineering
  • SCADA